Jobs
read: 5531
Industry | State | Client |
---|---|---|
Oil and Gas | Saudi | GAS ARABIAN SERVICES (GAS) |
Description |
---|
PURPOSE
The purpose of Risk based inspection strategy is to improve plant reliability and to optimize inspection intervals based on site-acceptable risk levels and operating limits, while mitigating risks as appropriate. Hence to carry out a detailed study of existing RBI related equipment and their reliability as well as operational performance concerns. Then, incorporate the best parts from existing reliability programs and build upon them to maximize the efficiency and effectiveness of the assets. The study shall aim to identify key issues affecting those equipment including asset reliability and integrity, premature failures, inspection costs, replacement costs and operational performance. MINIMUM REQUIREMENT
If you are interested with the above vacancy please send your updated CV to marketing@gunamandiri.com |